Jixi Jiapeng PumpedStorage Power Station Project, Anhui Province


Background

The Jixi Jiapeng PumpedStorage Power Station is located in Jingzhou Township and Jiapeng Township, Jixi County, Xuancheng City, Anhui Province, in the mountainous area of southern Anhui. It is approximately 35 km in straightline distance from Jixi County seat, about 200 km from Nanjing and 235 km from Hefei respectively. The power station has a total installed capacity of 1,400 MW (4 × 350 MW) with a rated water head of 583 meters and a total investment of about 8.398 billion RMB. It is developed and constructed by Wanneng Jixi Company, an affiliate of Wanneng Power under Anhui Energy Group.


The key hub structures of the power station consist of the upper reservoir, lower reservoir, water conveyance system, underground powerhouse cavern complex and ground switch station. The dam of the upper reservoir is a concretefaced rockfill dam with a maximum dam height of 90 m and a crest length of 395 m. The lower reservoir also adopts a concretefaced rockfill dam, with a maximum dam height of 95 m and a crest length of 504 m.


jixi-jiapeng-pumpedstorage-power-station-project1.png

Figure 1. Site schematic diagram


Project challenge

(1)Temperature control and crack prevention for concretefaced rockfill dam

Both the upper and lower reservoir dams are concretefaced rockfill dams. As critical components of the dam antiseepage system, face slabs feature thin thickness, large area and extensive exposed surfaces, making them highly susceptible to thermal shrinkage and drying shrinkage. Sharp daynight temperature fluctuations prevail in the mountainous region of southern Anhui. Improper temperature control during the hardening of faceslab concrete can easily cause penetrating cracks, which directly endanger the antiseepage safety of the dam. Besides, strong restraint exists at the contact interface between toeplate concrete and rockfill mass, further raising the cracking risk.


(2)Great difficulties in concrete supply and transportation arrangement

The upper and lower reservoirs sit on opposite mountain sides with an elevation difference of nearly 600 meters. Onsite roads are built along mountain slopes with steep gradients and sharp bends. Concrete needs to travel a long distance with large elevation difference from the batching plant to the crest of the upper reservoir dam. Transportation timeliness and safety are challenged under icy winter road conditions or slippery rainyseason conditions. Faceslab concrete placement requires continuous operation. Supply interruption would induce cold joints and impair the integrity and antiseepage performance of face slabs.


Solution from ARIT

To adapt to variable onsite test conditions and match the faceslab concrete mix proportion characterized by low waterbinder ratio and low binder content, retarding polycarboxylate superplasticizer is adopted to regulate the early hydration heat release process and avoid premature occurrence of temperature peak. The superplasticizer delivers moderate airentraining performance, introducing uniform microair bubbles into faceslab concrete to improve impermeability and buffer thermal stress. For sections in contact with rockfill mass, proper expansion components are compounded to compensate earlyage shrinkage and mitigate interfacial cracking risk.


Product from ARIT

ART-M63, ART-M15, ART-M611C and ART-CS

For detailed remixing formula, feel free to contact the technicians at ARIT.