The Pingtan Strait Rail-cum-Road Bridge is China’s first genuine cross-sea rail-cum-road bridge, as well as the world’s longest cross-sea rail-cum-road bridge. Starting from Songxia Town, Changle District, Fuzhou City, the bridge crosses four islands: Renyu Island, Changyu Island, Xiaolian Island and Dalian Island, and terminates at Pingtan Island. Its total length reaches 16.34 km, of which the cross-sea section exceeds 11 km. The upper deck carries a six-lane expressway with a design speed of 100 km/h, while the lower deck accommodates a Class-I double-track railway with a design speed of 200 km/h.
Construction commenced in November 2013. The bridge was fully connected in September 2019 and opened to full traffic in 2020. The Pingtan Strait, together with the Cape of Good Hope and the Bermuda area, is known as one of the world’s three major wind-gap sea zones and is nicknamed a “bridge-building forbidden zone”.
Figure 1 Pingtan Strait Bridge
The Pingtan Strait features a severe salt-fog corrosive environment. Temporary steel components require anti-corrosive painting 2-3 times per year, with an annual corrosion rate up to 1 mm. Concrete structures of pile caps and piers are subject to long-term chloride-ion penetration, sulfate attack and dry-wet cycling, giving rise to prominent durability risks. Anti-corrosion and rust inhibition for the marine environment pose major technical challenges: chloride ions penetrating to rebar surfaces break down the passivation film and trigger steel corrosion; sulfate attack causes expansive damage. Designed for a 100-year service life, the concrete must deliver high impermeability and strong resistance to chloride-ion ingress. This imposes stringent requirements on the binder system and mix-proportion design. The concrete must achieve high density and impermeability, form protective films on steel reinforcement to restrain long-term corrosion, and meanwhile satisfy pumping and casting requirements for pile foundation construction.
ARIT added the ART-LFZ anti-corrosion and rust-inhibiting admixture to concrete for pile foundations and pile caps. For heavily corrosive marine conditions, the dosage is 6%-8% by mass of cementitious materials (the water-borne product replaces an equal mass of mixing water). The admixture improves concrete compactness and erosion resistance, slows sulfate-induced deterioration, and forms protective films on rebar surfaces to block chloride-driven corrosion, thereby effectively extending the service life of structural members.
For detailed remixing formula, feel free to contact the technicians at ARIT.