Jiangsu ARIT New Materials Co.,LTD.
Jiangsu ARIT New Materials Co.,LTD.

Name

Shangqiu-Hefei-Hangzhou high-speed railway


Shangqiu-Hefei-Hangzhou high-speed railway


Line length

798km(496mi)


Operating speed

350km/h (217 mph)


concrete drying accelerator
concrete frostproofer

Background

The Shangqiu-Hefei-Hangzhou High-Speed Railway, also known as the "Second East China Corridor," is a high-speed rail line connecting Shangqiu in Henan Province, Hefei in Anhui Province, and Hangzhou in Zhejiang Province. The Huai River Grand Bridge on the Shangqiu-Hefei-Hangzhou High-Speed Railway is approximately 17 kilometers long, with a main span of 228 meters, and at the time of construction, it held the world record for the largest span of a high-speed railway bridge with ballastless track. After the completion of the Huai River Grand Bridge, trains will pass over the Huai River at a speed of 350 kilometers per hour, taking only a few seconds, which means the bridge will bear a huge impact force. This poses extremely high requirements for the construction quality of the project. 


Project Challenge

The on-site construction used the Type III slab track technology without ballast, which requires concrete with a low slump of 80mm to 140mm and a slump loss of no more than 20mm within 2 hours. 


Solution from ARIT

ARIT customized a product of high-performance water reducing admixture specifically for the purpose with low-sensitivity to slump-retaining, which well met the "three lows and one high" requirements for the base slab concrete construction.


Product from ARIT

For detailed remixing formula, feel free to connect technician of ARIT.


Have Any Questions?

Connect with ARIT for Premium Concrete Additives Wholesale

Leave a Message